
Northlands Retail Centre
Client | Kiwi Income Property Trust
Project Personnel | Dean Chrystal and Jonathan Clease
Location and Completion Date | Christchurch, ongoing
Planz have provided ongoing planning advice and assistance with obtaining the resource consents necessary to enable the operation and development of the 45,000m2 Northlands Shopping Centre. The Centre is continually evolving to ensure that it meets the community’s needs and responds to a changing retail environment following the Canterbury earthquake sequence.
Recent consents have included provision for a new hospitality and entertainment precinct, two new min-major tenants, and a multi-storey carpark.
Other resource consent projects
Nurse Maude Hospital
Civic & Community,Resource Consents
Following significant earthquake damage to the Christchurch hospital complex, Nurse Maude's redevelopment included repair and alteration of a listed heritage building, the establishment of a new utility building and resolution of soil contamination issues, and the establishment of a new Aged Residential Care facility.
Preschools
Civic & Community,Resource Consents
The Planz team have extensive experience in working with clients to gain resource consents for preschool developments in residential areas.
Christchurch Town Hall Repairs & Redevelopment
This $120 million project involved significant heritage issues and required careful resolution between retaining key heritage elements whilst delivering a functional civic building that was fit for purpose and commercially viable.
Theatre Royal Repairs & Redevelopment
The repair and rebuilding of the Theatre Royal formed an integral component of the Performing Arts Precinct as part of the wider regeneration of Central Christchurch.
Historic Homestead repairs and alterations
Planz has considerable experience in assisting clients with consenting for alterations and additions to historic homesteads and dwellings, which often include coordinating engineering, architectural, and heritage experts to ensure documentation is appropriate
Hydro Grand Hotel redevelopment
This challenging project involved the demolition of the heritage-listed Hydro Grand Hotel and its replacement with new office, hotel, apartment, and hospitality buildings set around a public plaza. Planz assisted in exploring repair and repurposing scenarios and in obtaining the associated engineering, heritage, and quantity surveying/ cost analysis.
Ashburton Railway Station
The historic Ashburton Railway Station had stood vacant for a number of years and the Court agreed that the building could be demolished after giving the Council and local community opportunities to explore fundraising and alternative uses.
Public heritage building repairs and alterations
We provide ongoing support to Councils' asset teams regarding repair and strengthening of council-controlled heritage buildings. These consents involve careful consideration of balancing the retention of heritage values with the need for economically sustainable and robust repair strategies
Horncastle Homes projects
Resource Consents,Residential & Rural
Planz have had a long relationship with Horncastle Homes in obtaining consents, from assisting individual homeowners, through to multi-unit developments in inner city locations and in higher density zones in new growth areas
Central City Townhouses
Resource Consents,Residential & Rural
Higher density living opportunities require careful consideration is given to design to ensure that good levels of amenity are provided for future occupants and to also ensure that such developments make a positive contribution to the character of the wider area
Billboards and signage
The Planz team have extensive experience in consenting billboards and signage, which typically involve liaison with lighting, transport, and urban design experts to achieve a successful and consentable design outcome. We regularly work with these experts and are well-versed in the preparation and presentation of evidence at hearings
Suburban retail developments
The Planz team have extensive experience in working with clients to gain resource consents for a range of suburban shopping blocks adjacent to residential areas, from small single tenant retailers to large retail strips that typically include a range of retail, café, and community services
Spitfire Square retail centre
Planz led the consenting for this large retail development within the Airport campus
The Tannery retail and hospitality precinct
This retail and leisure facility in south Christchurch has made an important contribution towards the regeneration of the wider area. A series of consents were all obtained on a non-notified basis.
Lake Tekapo – 200-room 5-star hotel
A new five-star hotel on the lake front in Tekapo required careful design and integration with the landscape and urban area to ensure success. We worked through design options with the Council and preparing and presenting evidence at a hearing.
Lincoln Bar, Restaurant and Library
This mixed-use development in the centre of Lincoln involved a new pub, restaurant, and library, which helped to anchor the Lincoln mainstreet in this rapidly growing community.
Hydro Grand Mixed Use Development
A significant mixed-use development in Timaru involved the replacement of a derelict heritage building with a new five-storey office building, six-storey apartment tower and six-storey hotel
Rural contractors’ yards
Resource Consents,Industry & Infrastructure,Residential & Rural
We provide ongoing advice and consenting for clients seeking to establish contractors’ yards, typically including storage and workshop facilities. Such consents often involve liaison with acoustic, traffic, and landscape experts and consideration of effects on rural character and neighbours
25,000 bird free range poultry farm
Resource Consents,Residential & Rural
Lamond Poultry engaged Planz to assist them in first developing site selection criteria and then in obtaining the necessary consents to get the result they wanted.
Waterloo Business Park Development
Resource Consents,Industry & Infrastructure
Planz led the plan change to rezone 114ha of land surrounding the old Islington Freezing Works to enable its redevelopment as a modern business park and distribution centre.
Liquigas expansion and upgrades
Resource Consents,Industry & Infrastructure
A significant increase in storage capacity for Liquigas’ primary LPG storage and distribution facility that services the upper South Island required careful planning and ongoing consultation.
Lyttelton Port marina
Resource Consents,Industry & Infrastructure
Establishment of land-side facilities to support the development of a new recreational boating marina in Lyttleton included a master plan for the wider area
Port of Tauranga and Port of Lyttelton Inland Ports
Resource Consents,Industry & Infrastructure
Both facilities involved the construction of rail spur lines and multi-hectare facilities for handling shipping containers from the ports, plus associated warehousing and load amalgamation and distribution facilities. Consents for both were obtained on a non-notified basis.
Christchurch Airport Campus Development
Resource Consents,Industry & Infrastructure
Planz has assisted CIAL for more than 20 years, including the redevelopment of both international and domestic terminals, the control tower, multi-storey parking building, on-campus hotels and backpacker accommodation, new hangars, and a range of aviation-related warehouse and distribution facilities.
Darfield Milk Processing Plant consents and plan changes
Resource Consents,Industry & Infrastructure
This $500 million project involved extensive public consultation, identification of the full range of potential environmental effects, and working collaboratively with both the project team and local councils
Churches and spiritual facilities
Civic & Community,Resource Consents
The Planz team have assisted a wide range of churches and religious organisations in developing spiritual facilities to meet community needs.
Healthcare
Civic & Community,Resource Consents
Planz have worked on various projects, ranging from small single professional practices in existing dwellings through to large purpose-designed healthcare centres that include a range of GP, dentist, physiotherapy, and pharmacy businesses
Primary and High School projects
Civic & Community,Resource Consents
A wide range of both primary and high school education projects have required Outline Plan preparation by the Planz team
Presbyterian Support & Methodist Mission centres
Civic & Community,Resource Consents
Two separate projects enabled the redevelopment of two social support agencies following earthquake damage in the centre of Christchurch
Surf Lifesaving Club redevelopments
Civic & Community,Resource Consents
The location of surf clubs begin within active dune systems necessitated the need to consider a wide range of issues including natural hazards, ecology, cultural, crime prevention, and acoustic matters
Sumner Library & Museum
This project was a key milestone in the post-earthquake recovery of Sumner Village and included Urban Design Panel presentations and careful consideration of CPTED issues
Central Library Anchor Project
Civic & Community,Resource Consents
This NZ$80 million project involved careful consideration of heritage and urban design matters to ensure a functional and attractive civic building was able to be delivered
AMI Stadium Redevelopment
Civic & Community,Resource Consents
Planz provided planning evidence, initial project management, and Hearing evidence for the award-winning redevelopment of AMI Stadium
Christchurch Botanic Gardens Visitor Centre
Civic & Community,Resource Consents
The development of a new visitor centre and café in the Christchurch Botanic Gardens involved ongoing consultation with Ngai Tahu to deliver an award-winning building in a sensitive landscape setting.
Hagley Oval Anchor Project
Civic & Community,Resource Consents
As well as preparing evidence for the Environment Court hearing, Planz worked closely with the Council’s Greenspace asset team to develop the application and associated set of conditions for this NZPI award-winning project
Christchurch Central Bus Interchange
Civic & Community,Resource Consents
This project involved the preparation of an Outline Plan of Works, participating in the project presentation to the Urban Design Panel, and liaison with City Council planning staff